How to make and install screw piles
In modern construction, the foundation on screw piles began to be used more and more often. This design is based on a steel pipe with the upper head.
The lower part is pointed and has a blade for more durable fixing in the ground. Operational period of 100 years, elements can be used secondly after the demolition of the building. A screw foundation when buried by a pile at a 2.5m can withstand a load of 5 tons.
Production of screw piles – the prerogative of new factories. All operations are performed by experienced employees. The manufacture of products is controlled at each stage in order to get high -quality, durable building materials that fully comply with all Russian and European standards, including ISO 9001. As a raw material, the material of the certification is necessarily applied.