Repair

Production and installation of screw piles

How to make and install screw piles

In modern construction, the foundation on screw piles began to be used more and more often. This design is based on a steel pipe with the upper head.

 The lower part is pointed and has a blade for more durable fixing in the ground. Operational period of 100 years, elements can be used secondly after the demolition of the building. A screw foundation when buried by a pile at a 2.5m can withstand a load of 5 tons.

Production of screw piles – the prerogative of new factories. All operations are performed by experienced employees. The manufacture of products is controlled at each stage in order to get high -quality, durable building materials that fully comply with all Russian and European standards, including ISO 9001. As a raw material, the material of the certification is necessarily applied.